About
Why B.IMillgram?
Vision & Mission
CEO
BIMG Team
BIMG Packages
Packages
Forward Engineering
Reverse Enginnering
Project
Project
Equipment
BIMG Story
Contact
English
한국어
Anyone from small-scale client to large-scale construction site
Easier Project Management
Alternative evaluation for project cost calculation
Introduction
Contact
Simplified Data
Solution for smart construction site management
Introduction
Contact
Accuracy down to millimeters
Utilizing drones and 3D scanners
to provide more accurate results
Introduction
Contact
Service
1. 실시설계 검토
It supports all basic functions of BIM such as visualization and interference check. Through this, errors in drawings can be minimized and various design changes can be responded quickly.
2. 내역산출
Quantity can be provided according to the details of the built model. Based on this, it can be used as preliminary data for construction cost forecasting.
BIMG Story
Project
more+
Project-
(주)네패스 반도체 시설
3. 대지분석
Drone site analysis saves on-site time and research costs, obtains accurate data of inaccessible locations, and maps all land
4. 건축(시설물) 분석
For buildings with missing data (partial or full) via 3D scanning, we provide architectural measurement capabilities.
5. 역설계 모델링
Even if the design book is not applied according to the complex situation of the site, an alternative can be found using a 3D scanner solution.
Project-
삼패동 근린생활시설
ABOUT B.I MILLIGRAM
Solving the problems scattered in the field of IT architecture
It implies that BIM will be used throughout the construction process.
Introduction to BIMG
Core values
Copyright© BIMILLIGRAM All rights reserved.
angle-down
cross
menu
arrow-alt-circle-up1